Skip to content

Master Test Checklist & Verification Matrix

The Master Test Matrix documents the complete validation baseline for the Aslandi Edge Converter prototype and production release candidates. All hardware revisions and firmware builds must pass these rigorous laboratory and soak test gates.


1. Subsystem Test Status Summary

Test SuiteDomainTotal CasesVerifiedLaboratory OnlyStatus
T00Host Environment & Firmware Build440✅ PASSED
T01Installer Wi-Fi & Local Web Panel880✅ PASSED
T02Modbus RTU & Meter Communications10101✅ PASSED
T03Time Synchronization & RTC Battery660✅ PASSED
T04Storage, LittleFS & Power Loss Recovery880✅ PASSED
T05Cloud Uplink & Offline Buffer Drain661✅ PASSED
T06Cryptography, Signatures & Security550✅ PASSED
T07Long-Term Reliability & Stress Soak431🟡 SOAK IN PROGRESS

2. Key Qualification Gates

A. 24-Hour Multi-Meter Soak Test (T02.9)

  • Configuration: 10 Zamel LEM-60 meters + 5 CHINT DTSU666 meters polled continuously every 15 seconds.
  • Criteria: Zero bus lockups, $< 0.01%$ frame CRC error rate, zero FreeRTOS task starvation events.
  • Result: Successfully logged over 120,000 queries with 100% data retention.

B. Sudden Power-Cut Cycling (T04.8)

  • Configuration: Programmable AC relay cutting power every 30 to 180 seconds across 500 consecutive power cycles.
  • Criteria: Zero corrupted LittleFS flash sectors, automatic generation repair of microSD blocks, zero configuration loss.
  • Result: Verified across 500 power cut cycles. Both Flash configuration slots maintained 100% integrity.

C. 50-Meter Address Scalability Qualification (T02.10)

  • Configuration: Simulated 50-meter bus array spanning address range 0x01 through 0x32.
  • Criteria: Complete bus scan completed in $< 12\text{ seconds}$; sequential query cycle for 50 meters completed in $< 8\text{ seconds}$.
  • Result: Verified timing compliance on Channel 0 at 9600 8N1.